Progress Of Tipp Hills Enhancement Project In Photos

714

Work is continuing on the Tipperary Hills Enhancement project

The Kickabout area is being levelled and reseeded

A viewing point at Mutton Pie has been enhanced.

Paths to the Mast area have been installed 

And a looped path has been installed on the top of the Cup and Saucer.

Works are expected to be completed by December including all planting.